{"id":179,"date":"2023-01-16T12:26:44","date_gmt":"2023-01-16T12:26:44","guid":{"rendered":"https:\/\/industria50rm.institutofomentomurcia.es\/technologies-5-0\/bim-building-information-modeling-and-simulation-models\/"},"modified":"2023-10-21T21:00:33","modified_gmt":"2023-10-21T21:00:33","slug":"bim-building-information-modeling-and-simulation-models","status":"publish","type":"page","link":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/technologies-5-0\/bim-building-information-modeling-and-simulation-models\/","title":{"rendered":"BIM (Building Information Modeling) and Simulation Models"},"content":{"rendered":"\n<div  class=\"content\">\n\n\t\n\t\t\t<div class=\"container\">\n\t\t\t\n\t\t\n\t\t\t\n<div class=\"row gap-col-md gap-row-md mb-xl\">\n\t\n\n<div class=\"col col-12 col-md-12 col-xl-12\">\n\t\n\t\n\t\n\t\n\n<h2 class=\"has-line wp-block-heading\"><span>Brief description of the technology<\/span><\/h2>\n\n\n\t\t<\/div>\n\n\n<div class=\"col col-12 col-md-12 col-xl-12\">\n\t\n\t\n\t\n\t\n\n<p class=\"has-color\">BIM is a collaborative work methodology that derives from Building Information Modeling, this new way of working is based on the use of an intelligent 3D model, based on data and not only on geometry. In the 3D BIM model, there is linkage, at all times, with the database, thus helping decision-making throughout the entire life cycle: from the design phase, through construction, commissioning, operation and maintenance, to the end of the useful life of the infrastructure.  installation or building.<\/p>\n\n\n\t\t<\/div>\n<\/div>\n\n<div class=\"row gap-col-md gap-row-md mb-xl\">\n\t\n\n<div class=\"col col-12 col-md-12 col-xl-12 mb-xs\">\n\t\n\t\n\t\n\t\n\n<h2 class=\"has-line wp-block-heading\"><span>Benefits of your <br\/>Incorporation into the company<\/span><\/h2>\n\n\n\t\t<\/div>\n\n\n<div class=\"col col-12 col-md-12 col-xl-12\">\n\t\n\t\n\t\n\t\n<div class=\"grid mrow gap-col-md gap-row-md\">\n\t\n\n<div class=\"grid-sizer grid-item mcol mcol-12 mcol-md-12 mcol-xl-4 is-card\">\n\t\t\n\n<h3 class=\" mb-xs wp-block-heading\">Economic<\/h3>\n\n\n\n<ul class=\"has-color\">\n<li>Customer loyalty.<\/li>\n\n\n\n<li>Improvement of the company&#8217;s image.<\/li>\n\n\n\n<li>Collaborative environment.<\/li>\n\n\n\n<li>Cost predictability.<\/li>\n\n\n\n<li>Intrinsic life cycle.<\/li>\n<\/ul>\n\n\t<\/div>\n\n\n<div class=\"grid-sizer grid-item mcol mcol-12 mcol-md-12 mcol-xl-4 is-card\">\n\t\t\n\n<h3 class=\" mb-xs wp-block-heading\">Management<\/h3>\n\n\n\n<ul class=\"has-color\">\n<li>Better customer service.<\/li>\n\n\n\n<li>Real-time updates.<\/li>\n\n\n\n<li>Multidisciplinary environment.<\/li>\n\n\n\n<li>Process improvement.<\/li>\n\n\n\n<li>Interference management<\/li>\n\n\n\n<li>Documentary coherence<\/li>\n<\/ul>\n\n\t<\/div>\n\n\n<div class=\"grid-sizer grid-item mcol mcol-12 mcol-md-12 mcol-xl-4 is-card\">\n\t\t\n\n<h3 class=\" mb-xs wp-block-heading\">Design-Calculation<\/h3>\n\n\n\n<ul class=\"has-color\">\n<li>Generation of construction models.<\/li>\n\n\n\n<li>Ability to work with complex geometries.<\/li>\n\n\n\n<li>Ability to analyse, calculate and simulate.<\/li>\n\n\n\n<li>Intelligent Digital Design: Parametric Elements.<\/li>\n\n\n\n<li>Energy efficiency analysis.<\/li>\n<\/ul>\n\n\t<\/div>\n<\/div>\n\n\t\t<\/div>\n<\/div>\n\n<div class=\"row gap-col-md gap-row-md\">\n\t\n\n<div class=\"col col-12 col-md-12 col-xl-12\">\n\t\n\t\n\t\n\t\n\n<h2 class=\" mb-xs has-line wp-block-heading\"><span>Examples of <br\/>Enterprise Application<\/span><\/h2>\n\n\n<div class=\"row gap-col-md gap-row-md\">\n\t\n\n<div class=\"col col-12 col-md-12 col-xl-6\">\n\t\n\t\n\t\n\t\n\n<p class=\"has-color\">Building for hospital use: Successful use of BIM, which allowed the correct coordination of the 20 installations, which ran through the narrow false ceilings of the building. Thus, like each contractor, it could assemble its corresponding installation independently, since each one had its route perfectly defined in advance; A time saving of approximately 10 months was achieved.<\/p>\n\n\n\t\t<\/div>\n\n\n<div class=\"col col-12 col-md-12 col-xl-6\">\n\t\n\t\n\t\n\t\n\n<p class=\"has-color\">Industrial building: allows you to draw up isometric assembly drawings for new extensions, revampings and repairs. In the long term, with the BIM modelling of the plant, which has been carried out using point cloud technology, the aim is to achieve a common database, on which to dump all the maintenance information and work orders, to take total control of the plant from the 3D model.<\/p>\n\n\n\t\t<\/div>\n<\/div>\n\n\t\t<\/div>\n<\/div>\n\t\t\t\n\t\t\n\t\t\t<\/div>\n\t<\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":155,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"acf":[],"_links":{"self":[{"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/pages\/179"}],"collection":[{"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/comments?post=179"}],"version-history":[{"count":1,"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/pages\/179\/revisions"}],"predecessor-version":[{"id":180,"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/pages\/179\/revisions\/180"}],"up":[{"embeddable":true,"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/pages\/155"}],"wp:attachment":[{"href":"https:\/\/industria50rm.institutofomentomurcia.es\/en\/wp-json\/wp\/v2\/media?parent=179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}